When modifiying the field Enrollment Status by Date field in a performance measure, if the days setting is changed to a specific date by clicking on the blue c, the next time the field needs to be edited (to change back to days for example), the blue c selection is missing. The only way to change the field is to remove it and start over by adding it to the report or performance measure criteria again.
This bug was found in build | 554 |
---|
This bug was fixed in build | 594 |
---|
TTP # | 1869 |
---|
Back to
BugsBack to
Frequently Asked Questions